saintb6969
Saintb6969
I have had it up to my ears with some of the bugs in this controller, So far I have broken 5 bits simply because sometimes the spindle will start when I hit cycle start, and sometimes it won't (hence the broken bits). So now I have to babysit the machine every time I start a project simply to make sure the spindle turn on, if not I have to hurry up and click spindle on before it crashes ( not what automation is suppose to be). Anybody have any ideas?
Another issue is that the machine is already moving to the material before the spindle can ramp up to speed (hence more broken bits). Why did they not build in a spindle ramp up delay?
Another issue Sometimes when I complete one file and load another no matter how many times I click cycle start it will not start until I click the re-wind button, even thou it is a new file.
Another issue, why does the touch probe not have a place to input the thickness in order to allow you to touch of the top of the material then deduct the thickness of the probe and set the Z Zero once it has made contact? ( even adding a button to send the machine downward in Z to make contact with the probe for setting Z Zero,probably would have made to much sense to do it that way)
One more Issue, Why does it take so long for the files to load, the DSP loads the same file in about a 1/3 of the time as the MASSO?
I know the majority of this is ranting, but up until installing the MASSO controller, I never had any of theses issues with the cheap Chinese DSP controller, only issue I had with it was no monitor and no way to adjust the feed rate on the go, and so far all I have gotten with the MASSO is a monitor and a bunch of headaches instead of completed projects. I am trying to give it a chance, but I am a frogs hair away from disconnecting the MASSO and going back to the DSP.
Another issue is that the machine is already moving to the material before the spindle can ramp up to speed (hence more broken bits). Why did they not build in a spindle ramp up delay?
Another issue Sometimes when I complete one file and load another no matter how many times I click cycle start it will not start until I click the re-wind button, even thou it is a new file.
Another issue, why does the touch probe not have a place to input the thickness in order to allow you to touch of the top of the material then deduct the thickness of the probe and set the Z Zero once it has made contact? ( even adding a button to send the machine downward in Z to make contact with the probe for setting Z Zero,probably would have made to much sense to do it that way)
One more Issue, Why does it take so long for the files to load, the DSP loads the same file in about a 1/3 of the time as the MASSO?
I know the majority of this is ranting, but up until installing the MASSO controller, I never had any of theses issues with the cheap Chinese DSP controller, only issue I had with it was no monitor and no way to adjust the feed rate on the go, and so far all I have gotten with the MASSO is a monitor and a bunch of headaches instead of completed projects. I am trying to give it a chance, but I am a frogs hair away from disconnecting the MASSO and going back to the DSP.